Tamil Nadu’s Government Consider More Desalination Solutions on Coastline

Tamil Nadu government is mulling over a proposal to set up a string of desalination plants across its 1,000km long coastline following excessive exploitation of groundwater resources in the coastal areas.

While Chennai Metrowater has set up two desalination plants in Minjur and Nemmeli with a capacity to treat 100 million litres of water a day, Tamil Nadu water supply and drainage board has established a plant at Ramanathapuram. Apart from Chennai, there are 12 coastal districts, including Tiruvallur, Kancheepuram, Cuddalore, Villupuram, Nagapattinam, Tiruvarur, Thanjavur, Pudukottai, Ramanathapuram, Tuticorin, Tirunelveli and Kanyakumari.

The state has already taken initiatives to set up two plants at Ramanathapuram and Tuticorin districts on Build-Own-Operate-Transfer basis. “But with the growing demands in the coastal areas, it is proposed to have a series of plants with a capacity to treat 50-100 million litres a day in a phased manner,” official sources said. The plan is that when these plants meet the local requirements, the distant river sources could be fully diverted to interior districts. The initial estimate is that 15.47tmcft of water could be supplied from 100MLD capacity plants in each of the 12 districts.

“Desalination plant is a good option. But given the fact that the government is to pay more to private firms to get the treated water, the optimal utilization of water has to be ensured,” said K Sivasubramaniyan of Madras Institute of Development Studies. Sivasubramaniyam who is also a water management expert, has a case to prove his point. In areas like Adyar where desalinated water from Nemmeli plant is supplied for several hours a day, water is used to supply to coconut trees. “People should be sensitized on the quantum of money spent to get desalinated water,” he said. The demand from TN remains tricky for water managers. A report says that the drinking water demand is likely to shoot up by 11% in 2020.

Pimagazine Asia Admin

Recent Posts

Insuring Wind Turbines, What is the Risk?

Gallagher Re has shed light on the significant challenges insurers face when providing coverage for…

8 months ago

ARENA Start Feasibility Study in Western Australia

The Australian government will disburse AUD 1.7 million (USD 1.1m/EUR 1m) in grant funding to…

8 months ago

Asia moving away from Solar?

GlobalData’s latest report, ‘Asia Pacific Renewable Energy Policy Handbook 2024’ is among the latest region-specific…

8 months ago

Asia’s Energy Challenge 2024

The electrical generation market is facing a number of challenges, including the need to increase…

8 months ago

Powering Progress: Nuclear Energy’s Role in Asia’s Energy Landscape

Nuclear energy has emerged as a prominent player in Asia's energy landscape, offering a reliable…

1 year ago

Charting a Cleaner Path: Carbon Capture and Storage in Asia

The pursuit of a low-carbon future has gained significant momentum globally, and Asia stands tall…

1 year ago